See this example
A DAILY plan with Completion Requirement Tick and Start of cycle date 01.11.2013 has been illustrated here.
When I TECOed the call no.1 Call2 (Scheduled Hold) converted into a line like Call 3, above.
And when the call 2 object TECOed Call 3 object became like Call 4 above.
The present status in the picture is Call 3 object is TECOed.
Jogeswara Rao K