Hi Ganesh,
Point is only to delete the old requests more than 60 days in standard DSOs similar to Write optimized DSOs in the staging layer (1st level).
My flow is WDSO->Standard DSO (Level 1)->Cube (Delta)
Standard DSO-> Standard DSO(Level 2)->Cube (Delta)
I don't want the delta mechanism to be disturbed in both these scenarios.
I guess I can delete the WDSO old requests through program.
How about the Standard DSO old requests (But problem is it got 3 tables)